First Floor Plan: Before
First Floor Plan: After
Second Floor Plan: Before
Second Floor Plan: After
Third Floor Plan: Before
Third Floor Plan: After
Seal all plumbing, electrical, and
other penetrations of walls and floors, and seal joints.
|
Continuous drainage plane behind
exterior wall cladding fully sealed at all penetrations
|
Raise paper covered gypsum board
1/2" above concrete slab
|
Fully flash all window and door
openings
|
Installed system for diverting
roof water from house (e.g. gutters of overhangs in dry climates)
|
No. 30 roof felt underlayment
minimum
|
Reduced ice dams: No non-airtight
recessed light fixtures in insulated flat ceilings; no non-airtight recessed
fixtures in insulated cathedral ceilings.
|
Nonpaper-faced backer board used
in all tubs, showers, and spa areas.
|
Water-resistant flooring in the
kitchen, bathroom, laundry rooms, and spa areas.
|
Water-resistant flooring within 3
feet of all exterior doors.
|
Drain and drain pan installed for
any tank water heaters in or over living spaces
|
Drain and drain pan OR
single-throw supply valve installed for any clothes washers in or over living
spaces
|
Conventional clothes dryers exhausted
directly to outdoors
|
Whole house ventilation and local
kitchen and bathroom exhaust systems that comply with ASHRAE Std. 62.2
|
Use highly durable materials in
wet areas
|
Exposed concrete slab edge
insulated.
|
Install insulation per Thermal
Bypass Checklist
|
All ductwork within conditioned
space
|
Window: U-factor ≤ 0.40
|
Exterior doors to be weather
sealed
|
Basement walls insulated
|
Seal external cracks, joints, etc.
with caulking and install pest-proof screens
|
Use solid concrete foundation
walls or pest-proof masonry wall design
|
keep all wood 12" above grade
|
Provide minimum 4" diameter
PVC pipe to vent Radon gas from under slab to roof or exterior wall.
|
Provide junction box at roof end
of pipe for future exhaust fan.
|
Use solid concrete floor
|
LEED is a voluntary, consensus-based, market-driven program that provides third-party verification of green buildings. From individual buildings and homes, to entire neighborhoods and communities, LEED is transforming the way built environments are designed, constructed, and operated. Participation in the voluntary LEED process demonstrates leadership, innovation, environmental stewardship and social responsibility. LEED provides building owners and operators the tools they need to immediately impact their building’s performance and bottom line, while providing healthy indoor spaces for a building’s occupants.1
1. Innovation & Design (ID) Process.Special design methods, unique regional credits, measures not currently addressed in the Rating System, and exemplary performance levels.
2. Location & Linkages (LL). The placement of homes in socially and environmentally responsible ways in relation to the larger community.
3. Sustainable Sites (SS). The use of the entire property so as to minimize the project’s impact on the site.
4. Water Efficiency (WE). Water conservation practices, both indoor and outdoor.
5. Energy & Atmosphere (EA). Energy efficiency, particularly in the building envelope and heating and cooling design
6. Materials & Resources (MR). Efficient utilization of materials, selection of environmentally preferable materials, and minimization of waste during construction.
7. Indoor Environmental Quality (EQ). Improvement of indoor air quality by reducing the creation of and exposure to pollutants.
8. Awareness & Education (AE). The education of homeowner, tenant, or multifamily building manager about the operations and maintenance of the green features of a LEED Home.2